
Columbus Crew Wallscape in Downtown Columbus To Be Finalized Tomorrow, February 23
February 22, 2006 - Major League Soccer (MLS)
Columbus Crew SC News Release
The Columbus Crew and Orange Barrel Media will put the finishing touches on an 80-foot Wallscape on the side of the Brunson building tomorrow, Feb. 23, between 1:30-3:30 p.m. The building is located at 145 N. High Street, between Spring and Long Streets, in downtown Columbus.
The Brunson building is 120-feet high, with the Wallscape starting 40-feet off the ground. Between the 10th and 12th floors is a 25-foot-in-diameter, 600-pound aluminum, chicken wire and foam soccer ball. A portion of the Wallscape also wraps around the west side of the building. The Wallscape banner is vinyl.
Ryan Partnership was responsible for the creative design, while Orange Barrel Media produced the 3D ball, is affixing it to the building and brokered the rental of two of the walls on the building.
Major League Soccer Stories from February 22, 2006
- Revolution draw 0-0 with LD Alajulense in CONCACAF Champions Cup - New England Revolution
- Chivas USA forward 'Paco' Palencia to record TV spot tomorrow for American Red Cross - Club Deportivo Chivas USA
- Columbus Crew Wallscape in Downtown Columbus To Be Finalized Tomorrow, February 23 - Columbus Crew SC
- Real Salt Lake falls 2-1 to Viborg FF - Real Salt Lake
- Galaxy sign 2006 MLS SuperDraft picks forward Marc Burch and defender Kyle Veris - LA Galaxy
- Ching Back In Town - Houston Dynamo FC
- Real Salt Lake Acquires Pick From Columbus - Real Salt Lake
The opinions expressed in this release are those of the organization issuing it, and do not necessarily reflect the thoughts or opinions of OurSports Central or its staff.
Other Recent Columbus Crew SC Stories
- Columbus Crew's Max Arfsten, Patrick Schulte and Sean Zawadzki Called up to U.S. Men's National Team's June Camp
- Columbus Crew Draws FC Cincinnati, 1-1
- Columbus Crew Draw CF Montreal 1-1
- Columbus Crew, Lower.com Field Host U.S. Men's National Team Friendly vs. Japan on Tuesday, September 9
- Columbus Crew Unveil Three Elevated Premium Spaces for 2026 Season

